Comfirm An Operation Plan


 

CONFIRM AN OPERATION PLAN

  1. Choose the line operation plan which needs to be confirmed
  2. Confirm: An operation plan should be confirmed only after the operation plan is ready for usage in AOMTOPS/MES. The integrity must be checked before a plan is confirmed because after confirming, the plan is locked and can’t be modified further.

 

TOP